Steel Trestle Structure for Conveyor Belt

Short Description:

Coal transport corridor is steel structure, overhead setting, closed or not closed, installed conveyor for coal transport. Used in large power plant, coal mine, coking plant etc. The span is mostly between 30m~60m. When the span is larger, the supporting column can also be added in the span to form a continuous truss. Belt conveyors are usually arranged on the lower chord plane of the truss, so the corridor structural system is actually a space truss system composed of the force truss and the upper and lower chord wind bracing trusses.


Product Detail

Product Tags

General Information

Heavy industrial buildings is a collection of structures that consist of large section steel components with heavy self weight, large height or large spans.The are widely used in industrial production lines like shipyard workshops, multi-floor frame structures like power plant workshops, chemical plants, coal washery plants, concrete plants, etc..

Frame structure is the most common structure type for heavy industrial buildings as they always need to support high rise turbine equipment and realize compliated functions with multiple floors. The frame structure is always connected with trestle stucture galleries that transport raw materials to the processing zone. Steel trestle caonveyor galleries are listed separately in our product list and you can check details there. Large span PEB structure that calls for huge columns in H sections, lattice sections, box sections are also listed here as heavy industrial buildings. They usually have big clearance height and width.

Steel Structure Specifications:

1.Material:  Q235B or Q345B

2.Certification: CE, BV, SGS

3.Design: according to customer's requirement or we make a design for our clients

4.Quality control : manufacturer with high quality control or use the third party

5.Installation: Our Engineer helps to instruct the installation or we send the Engineer to construction site

6.Guarantee:  The main structure over 35 to 50 years, wall the roof cladding: 15Years

Delivery

1. Lead Time: 30-45 days

2. Loaded in 20GP, 40HC;

3. Package: Standard Package

Product Show

2122
2122
2122
2122
2122
2122
2122
2122

  • Previous:
  • Next:

  • Application

    Related Products