The construction of high altitude sliding method has the following characteristics? 2022.2.15
1, the mechanical requirements are relatively high. The construction of high altitude sliding method requires that the whole construction area should be within the working radius of vertical transport machinery, and the machinery should be
occupied for a long time. Adequate vertical transport machinery should be prepared before construction.
2, do not need to set up scaffolding, cost saving. This construction method requires the construction personnel to complete the construction of a small unit before the completion of the construction, suitable for the constructi
n area below thescaffolding setting conditions or fire sprinkler scaffolding engineering is too large.
3, the construction speed is slow. Due to the construction process needs to combine the grid frame into composite parts on the ground and then mechanically lift it to the installation site, the construction personnel assemble it
in the air, limited by the work in the air, and the composite is composed of 3 rods and 1 ball, so it isrelatively difficult to install it to a predetermined position (at the same time, 3 bolts are inserted into the corresponding bolt holes).The above contents are sorted out according to the problems encountered in the practical work of the students for your reference. Please timely communicate and correct any problems.